THE DEVELOPMENT OF A SURVEY INSTRUMENT FOR MEASURING A RELATIONSHIP BETWEEN STATISTICAL PROCESS CONTROL SUCCESS FACTORS AND PERFORMANCE

Authors

  • Jafri Mohd Rohani Department of Industrial and Production Engineering, Faculty of Mechanical Engineering, Universiti Teknologi Malaysia, 81310 Johor Bahru, Johor, Malaysia.
  • Sha’ri Mohd. Yusof Department of Industrial and Production Engineering, Faculty of Mechanical Engineering, Universiti Teknologi Malaysia, 81310 Johor Bahru, Johor, Malaysia.
  • Ismail Mohamad Department of Mathematics, Faculty of Science, Universiti Teknologi Malaysia, 81310, Johor Bahru, Johor, Malaysia

Keywords:

Statistical process control success factors, quality and firm performance, survey instrument, psychometric properties, exploratory factor analysis.

Abstract

The present study highlights the instrument development to measure the relationship between statistical process control success factors construct and performance construct. From an extensive review of literature of statistical process control implementation, eleven dimensions of statistical process control success factors and three dimensions of performance were identified. In this paper, a survey instrument to measure SPC success factors construct associated with quality and firm performance was proposed. The reliability and validity of this survey instrument were tested using data from 122 respondents. It was concluded that instrument developed in this paper has satisfactory psychometric properties, reliable and valid. Hence the researcher can use this survey instrument to build the model to find the relationship between statistical process control success factors construct and performance construct. Industrial practitioners can use this survey instrument to identify and predict the success of their SPC implementation projects through managing of these associated factors.

References

Aaker, D.A. and Jacobson, R., 1994. The financial information content of perceived quality, Journal of Marketing Research, 31: 191-201

Adam, E.E. and Thomas, F.S., 2000. Quality improvement approach and performance: multisite analysis within a firm, Journal of Quality Management, 5: 143-158.

Ahire, S.L. and Dreyfus, P, 2000. The impact of design management and process management on quality: an empirical examination, Journal of Operations Management, 18: 549- 575.

Antony, J. Balbontin, A and Taner, T., 2000. Key ingredients for the effective implementation of Statistical Process Control, Work Study, 49(6): 242-247.

Antony, J. and Taner, T., 2003. A conceptual framework for the effective implementation of statistical process control, Business Process Management, 9(4): 473-489.

Bird, D and Dale, B., 1994. The misuse and abuse of SPC: a case study, International Journal of Vehicle Design, 15(1): 99-107

Bounds, GM., 1988. Success in implementing statistical process control as a function of contextual variables in 20 manufacturing organizations, unpublished Ph.D. thesis, The University of Tennessee, USA.

Bullington, S.F. Easley, J.Y. and Greenwood, A.G., 2002 Success factors in initiating versus maintaining a quality improvement process, Engineering Management Journal, 14(3): 8-14

Brannstrom-Stenberg, A. and Deleryd, M., 1999. Implementation of Statistical Process Control and process capability studies: Requirements or free will, Total Quality Management, 10(4): 439-446

Cagwin, D. and Bouwman, M.J., 2002. The association between activitybased costing and improvement in financial performance, Management Accounting Research, 13: 1 – 39.

Carmines, E.G. and Zeller, R.A., 1979. Reliability and Validity assessment. Sage. Beverly Hills, CA.

Carr, A.S., Leong, G.K. and Sheu, C., 2000. A study of purchasing practices in Taiwan, International Journal of Operations and Production Management, 20(12): 1427-1445.

Cheng, P.C. and Dawson, S.D., 1998. A study of statistical process control: practice, problems, and training needs, Total Quality Management, 9(1): 3-20

Cohen, J., 1988. Statistical Power Analysis for the Behavioral Sciences, 2nd. Edition, Hillsdale, N.J.: Laurence Erlbaum.

Comrey, A., 1973. A First Course on Factor Analysis, London: Academic Press.

Cronbach, L.J., 1951. Coefficient Alpha and the Internal Consistency of Tests, Psychometrica, 16: 297-334.

Donell, A.J., and Singhal, S.C., 1996. SPC implementation for improving product quality, IEEE/CPMT International Electronics Manufacturing Technology Symposium.

Deleryd, M. Deltin, J and Klefsjo, B., 1999a. Factors for successful implementation of Process Capability Studies, Quality Management Journal, 17: 40-59.

Deleryd, M. Garvare, R. and Klefsjo, B., 1999b. Experiences of

implementing statistical methods in small enterprises, The TQM Magazine, 11(5): 341-350.

Does, R. Shippers, W. and Trip, A., 1997. A framework for implementing of statistical process control, International Journal of Quality Science, 2(3): 181-198.

Dow, D. Samson, D. and Ford, S., 1999. Exploding the myth; Do all quality management practices contribute to superior quality performance?, Productions and Operations Management, 1: 1-27.

Fields, D.J., 1991. A study of work environment factors associated with the transfer of statistical process control training to shop floor application, unpublished PhD thesis, Michigan State University, USA.

Flynn, B.B. Schroeder, R.C. and Sakakibara, S., 1994. A framework for quality management research and an associated measurement instrument, Journal of Operation Management, 11: 339-366.

Fornell, C. Johnson, M.D. Anderson, E.W. Cha, J. Bryant, B.E., 1996. The American customer satisfaction index: nature, purpose and findings, Journal of Marketing, 60(4): 7-18.

Grigg, N.P., 2004. An empirical investigation of the use of statistical process control and improvement methodologies within food and drinks manufacturing facilities in the UK, unpublished Ph.D Thesis, University of Strathclyde, Glasgow.

Goh, T.N. and Xie, M., 1998. Prioritizing processes in initial

implementation of statistical process control. IEEE Transaction on

Engineering Management, 45(1): 66-71.

Gordon, M.E. Philpot, J.W. Bounds, G.M. and Long, W.S., 1994. Factors associated with the success of the implementation of statistical process control, The Journal of High Technology Management Research, 5(1): 101- 121.

Hair Jr, J.F. Anderson, R.E. Tatham, R.L. and Black, W.C., 1998. Multivariate Data Analysis, 5th Edition, Prentice-Hall: Englewood Cliffs, N.J.

Hair Jr, J.F. Anderson, R.E. Tatham, R.L. and Black, W.C., 2005. Multivariate Data Analysis, 6th Edition, Prentice-Hall: Englewood Cliffs, N.J .

Harris, C.R. and Yit, W., 1994. Successfully implementing Statistical Process Control in integrated steel companies, Interfaces, 24: 49-58.

Kaiser, H.F., 1970. A Second Generation Little Jiffy, Psychometrika, 35: 401-417.

Kaynak, H., 2003. The relationship between total quality management practices and their effects on form performance, Journal of Operations Management, 21: 405-435.

Kemp, R.G.M., 1999. Managing interdependence for joint venture success: an empirical study of Dutch international joint venture. PhD Thesis, University of Groningen, Groningen.

Mason, B. and Antony, J., 2001. Statistical Process Control: An essential ingredient for improving service and manufacturing quality, Measuring Business Excellence, 5: 47 – 51.

Ngai, EWT. Cheng, TCE. And Ho, SSM., 2004. Critical success factors of web-based supply chain management systems: An exploratory study, Production Planning and Control, 15: 622-630.

Nunally, J.C., 1978. Psychometric Theory, Second Edition, New York, McGraw-Hill.

Nunally, J.C. and Bernstein, I.A., 1994, Psychometric Theory, Third Edition: McGraw-Hill.

Norusis, M.J., 1999. SPSS 9.0 guide to data analysis, Prentice-Hall: Englewood Cliffs, N.J.

Prajogo, D.I. and Brown, A., 2004. The relationship between TQM practices and quality performance and the role of formal TQM programs: An Australian empirical study, Quality Management Journal, 11(4): 31 – 42.

Rohani, J.M. Yusof, S.M. and Mohamad, I., 2006. Using structural equation modeling to establish critical success factors interdependence in statistical process control implementation, 2nd. International Conference on Six Sigma, 5 – 7 June., Glasgow, U.K.

Robinson, T.L., Audibert, R.L. and Zenda, W., 2000. Statistical Process Control : It’s a Tool, not a Cult, Manufacturing Engineering, 3: 104-117.

Rungtusanatham, M, Anderson, J. and Dooley, K., 1997. Conceptualizing organizational implementation and practice of Statistical Process Control, Journal of Quality Management, 2(1): 113-137.

Rungtusanatham, M. Anderson, J. and Dooley, K., 1999. Towards measuring the SPC implementation/practice construct. International Journal of Quality & Reliability Management, 16(4): 301-329

Rungasamy, S. Antony, J and Ghosh, S., 2002. Critical success factors for SPC implementation in UK small and medium enterprises: some key findings from a survey, The TQM Magazine, 14(4): 217-224.

Reid, R.D., 2005. TS 16949 – Where did it come from?, Quality Progress, 38: 31 – 38.

Shamsuddin, A. and Masjuki H., 2003. Survey and case investigations on application of quality management tools and techniques, International Journal of Quality & Reliability Management, 20(7): 795 - 826.

Spector, P., 1992. Summated Rating Scale Construction: An Introduction, Sage university Paper series on Quantitative Application in th Social Sciences, series no 07-082, Newbury Park, CA: Sage.

Sousa, R. and Voss, C.A., 2002. Quality management re-visited: a reflective review and agenda for future research, Journal of Operations Management, 20: 91-109.

Xie, M. and Goh, T.N., 1999. Statistical technique for quality, The TQM Magazine, 11(4): 238-241.

Young, T.M and Winistorfer, P.M., 1999. SPC: Statistical Process Control and the forest products industry, Forests Product Journal, 49(3): 10 – 16.

Date, B.G., 1994. Managing Quality, Prentice Hall, Hemel Hempstead

Owen, M., 1989. SPC and Continuos Improvement, IFS Publication, Bedford.

Oakland, J.S., 1999. Statistical Process Control, 4th. Ed., ButterworthHeinemann, Oxford.

Downloads

Published

2018-04-04

How to Cite

Mohd Rohani, J., Mohd. Yusof, S., & Mohamad, I. (2018). THE DEVELOPMENT OF A SURVEY INSTRUMENT FOR MEASURING A RELATIONSHIP BETWEEN STATISTICAL PROCESS CONTROL SUCCESS FACTORS AND PERFORMANCE. Jurnal Mekanikal, 30(1). Retrieved from https://jurnalmekanikal.utm.my/index.php/jurnalmekanikal/article/view/106

Issue

Section

Mechanical

Similar Articles

<< < 7 8 9 10 11 12 13 14 15 16 > >> 

You may also start an advanced similarity search for this article.