SURVEY RESULTS OF TOTAL PRODUCTIVE MAINTENANCE EFFECTS ON MANUFACTURING PERFORMANCE IN MALAYSIA ELECTRICAL AND ELECTRONICS INDUSTRY

Authors

  • Jonathan Wee Jian Meng Faculty of Mechanical Engineering Universiti Teknologi Malaysia 81310 Johor Bahru, Johor
  • Noordin Mohd Yusof Faculty of Mechanical Engineering Universiti Teknologi Malaysia 81310 Johor Bahru, Johor

Keywords:

TPM elements/strategies, manufacturing performance, Malaysia, electrical and electronic industry

Abstract

Many frameworks of Total Productive Maintenance (TPM) elements have been proposed by different authors in the literature. However, most of them are based on studies done in countries such Japan, Italy, USA, China and India. There is a need to evaluate TPM elements/strategies and their contribution towards manufacturing performance in electrical and electronics industry in Malaysia. Towards that end, a survey was conducted where questionnaires are sent to 240 companies in the electrical and electronic industry in Malaysia with the resulting response rate of 12.5 %. The TPM element most emphasized in Malaysian electrical and electronics industry is planned maintenance management while the least emphasized element is top management leadership. Using Pearson Correlation Coefficient, the correlation between TPM elements emphasis and manufacturing performance dimension was determined. The study found that TPM elements – top management leadership, planned maintenance management, focused improvement, autonomous maintenance and education and training have significant contribution towards manufacturing performance such as lower cost, higher quality, strong delivery and increased productivity. These five elements could be used as a guideline for companies wanting to implement TPM as well as evidence to convince management of the importance of TPM towards the organization. Besides that, this study also found no significant differences of TPM element practices between electrical and electronic industry while only some elements are significant between small medium industry (SME) and large companies. In addition, the longer TPM is practiced, the more improvement resulted in manufacturing performance.

References

Ahmed, S.M. & Hassan, M. (2003). Survey and case investigations on application of quality management tools and techniques in SMIs. International Journal of Quality & Reliability Management, Vol. 20, No. 7, pp. 795-826

Ahuja, I.P.S., Singh, T.P., Sushil and Wadood, A., (2004). “Total productive maintenance implementation at Tata Steel for achieving core competitivenessâ€, Productivity, Vol.45 No. 3, pp.426-6.

Ahuja, I.P.S. and Khamba, J.S. (2007). â€An evaluation of TPM initiatives in Indian industry for enhance manufacturing performanceâ€, Journal in Quality in Maintenance Engineering, Vol. 13 No. 4, pp 338-52.

Ahuja, I.P.S. and Khamba, J.S. (2008). â€Justification of total productive maintenance in Indian manufacturing industry for achieving core competitivenessâ€, Journal in Manufacturing Technology Management, Vol. 19 No. 5, pp 645-669.

Ahuja, I.P.S. and Pankaj Kumar. (2009). A case study of total productive maintenance implementation at precision tube mills, Journal of Quality in Maintenance, Vol 15 No.3, pp.241-258.

Ames, V. A., (2003). “TPM Interview. T. Pomorskiâ€, Austin, Tx.

Bamber, C.J., Sharp, J.M and Hides, M.T., (1999) ‘Factors affecting successful implementation of Total Productive Maintenance: a UK manufacturing case study perspective’, Journal of Quality in Maintenance Engineering, Vol. 5, No. 3, pp 162-181.

Bargozi, R. P., (1980). Casual Models in Marketing. Wiley, New York, NY.

Blanchard, B. S. (1997). An enhanced approach for implementing total productive maintenance in a manufacturing environment, Journal of Quality in Maintenance Engineering, Vol. 3 No. 2, pp 13-16.

Bosman, H. (2000). “TPM Activities Toward Winning the World Class Award.†JIPM TPM 16: 4-7.

Cheng, Choon Ho .(2005). “Proposal for TPM in a process industryâ€, Call No. TS192 C43 2005, Skudai: University Technology Malaysia

Cooke, F. L., (2000) “Implementing TPM in plant maintenance: some organizational barriersâ€, International Journal of Quality and Reliability

Management, Vol. 17 No. 9, pp. 1003-16.

Cramer, D. (1998) “Fundamental Statistics for Social Research†(London, Routledge)

Gustafsson, R., Klefsjo, B., Berggren, E. and Granfors-Wellemets, U. (2001), “Experiences from implementing ISO 9000 in small enterprises – a study of Swedish organizationâ€, The Quality Magazine, Vol. 13 No. 4, pp. 232-46

Herbaty, F. (1990), Handbook of Maintenance Management: Cost Effective Practices, 2nd ed., Noyes Publication, Park Ridge, NJ.

Horner, M., (1996) Analysis of Total Productive Manufacturing Teams in Semiconductor Manufacturing Organization, University of North Texas, Denton, TX.

Ireland, F and Dale, B.G., (2001). ‘A study of total productive maintenance implementation’, Journal of Quality in Maintenance Engineering, Vol. 7 No. 3, pp. 183-191

Jusoh, A., R. Z., Yusoff and S., Mohtar, (2008). “Determining TQM practices in university R&D activities using factor analysis: Research experience of Malaysian universities†Jurnal Kemanusiaan, 11 (1), pp. 36-54.

Kathleen, E. Mc. K., Roger G.S and Krity O.C. (1999) ‘Total productive maintenance: a contextual view’, Journal of Operation Management, Vol 17, pp. 123-144.

Kathleen, E. Mc. K., Roger G.S and Krity O.C. (2001). The impact of total productive maintenance practices on manufacturing performance, Journal of Operation Management, Vol 19, pp. 39-58.

Leflar, J. (1999), TPM at Hewlett-Packard. 10th Total Productive Maintenance Conference, Las Vegas, NV, Productivity, Inc.

Leflar, J. (2003). TPM Interview. T. Pomorski. Fort Collins, CO

Luxford, G. (1998) ‘Measurement of overall equipment effectiveness as a basic for TPM activities’, International Journal of Operations and Production Management, Vol. 18, No. 5,pp. 495-507.

Lycke, L., (2000). Team development when implementing TPM, Total Quality Management, Vol. 14 No. 2, pp. 205-13.

Pai, K. G. (1997), “Maintenance Managementâ€, Maintenance Journal, OctoberDecember, pp. 8-12

Patterson, J. W., Kennedy, W. J and Fredendall, L. D., (1996) “Total productive maintenance is not for this company,†Production and Inventory Management Journal, 36 (2), pp. 61-64

Maier, F. H., Milling, P. M. and Hasenpusch, J., (1998) “Total Productive Maintenance: An International Analysis of Implementation and Performance.â€

Max International Group. (2004). Total productive maintenance. Available online at: http://www.maxieg.com/operational6.htm

MIDA. (2004). Business opportunities in Malaysia’s electronic industry, Published by the Electronics Industry Division and ICT & Electrical Industries Division, Website: http://www.mida.gov.my

Mishra, R.P., Anand, G. and Kodali, R. (2008). A SWOT analysis of total productive maintenance frameworks, Int. J. Management Practice, Vol. 3, No. 1, pp. 51-81.

Nakajima, Seiichi. (1989). Introduction to TPM. Cambridge, Mass.: Productivity Press.

Nunnally, J. C. (1978). Psychometric theory (2nd ed.). New York: McGraw-Hill.

Nwankwo, S. (2000), “Quality assurance in small organizations: myths and realitiesâ€, International Journal of Quality & Reliability Management, Vol. 17 No. 1, pp. 82-99.

Raouf, A. and Ben-Daya, M. (1995) “Total maintenance management: a systematic approachâ€, Journal of Quality in Maintenance Engineering, Vol. 1 No. 1, pp. 6-14.

Robinson, C. J. and A. P. Ginder., (1995) “Implementing TPM: The North American Experienceâ€, Portland, OR, Productivity Press.

Sangameshwran, P and Jagannathan, R. (2002). Eight Pillars of TPM, Indian Management, Vol. 1, pp. 3-67.

Saylor, J.H. (1992). TQM Field Manuals, New York, McGraw-Hill

Schroeder, R. G., (1993) “Operation management, Decision Making in the Operation Functionâ€, 4th edn. McGraw-Hill, New York

Shamsuddin A., Masjuki, Hj.H, and Zahari, T. (2004) “State of implementation of TPM in SMIs: a survey study in Malaysia’, Journal of Quality in Maintenance Engineering. Vol. 10, No. 2, pp. 93-106

Shamsuddin, A., Hassan, M.H. and Taha, Z. (2005) “TPM can go beyond maintenance: expert from a case implementationâ€, Journal of Quality in Maintenance Engineering, Vol. 11 No. 1, pp.19-42.

Shiba, S., Graham, A., Walden, D., (1993). A New American TQM: Four Practical Revolutions in Management. Productivity Press, Cambridge, MA

Shingo Nakamura, (2007). TPM in semiconductor plants, JIPM-Solutions

Sim, H.K and Shari Mohd Yusof. (2003). Development of TPM implementation plan in switchgear and engineering company, International Conference on Mechanical Engineering (ICME2003), Dhaka, Bangladesh.

Skinner, W., (1969) “Manufacturing – missing link in corporate strategy,†Harvard Business Review 47 (3), 136-145

Suzuki, T. (1994). TPM in Process Industries, Productivity Press, Portland, OR

Takahashi, Y. and T. Osada. (1990). TPM: Total Productive Maintenance. Tokyo, Asian Productivity Organization.

Tajiri, M. and F. Gotoh., (1992). “TPM Implementation - A Japanese Approachâ€, New York, McGraw Hill.

Takahashi, Y. and T. Osada. (1990). TPM: Total Productive Maintenance. Tokyo, Asian Productivity Organization

Telang, A. D. (1998), “Preventive maintenanceâ€, in Vijaykumar, K. (Ed.), Proceeding of the National Conference on Maintenance and Condition

Monitoring, February 14, Government Engineering College, Thissur, India, Institution of Engineers, Cochin Local Centre, pp. 160-73

TPM Club India. (2003). The TPM 8 pillars. Available online at:

www.tpmclubindia.org

Tsang, A.H.C. and Chan, P.K. (2000) ‘TPM implementation in China: a case study’, International Journal of Quality & Reliability Management, Vol. 17 No. 2, pp. 144-157.

Volvo Cars Gent (1998) TPM pillars. Available online at:

http://www.volvocarsgent.be/content_en/g/g2.htm

Ward, P.T., Duray, R., Leong, G.K., Sum, C.C. (1995). Business environment, operations strategy and performance: an empirical study of Singapore manufacturers. Journal of Operations Management 13, 99–115.

Williamson, Robert, M., (2006) “Total Productive Maintenance: What It Is and What It Is Notâ€, Strategic Work Systems, Inc. Columbus, NC 28722

Willmott, P., (1994). Total Productive Maintenance: The Western Way. Oxford, England, Butterworth- Heinemann, LTD

Wireman, T., (1991) “Total Productive Maintenance - An American Approachâ€, New York, Industrial Press

Yamashina, H. (2000). Challenge to world-class manufacturing. International Journal of Quality & Reliability Management, Vol. 17 No 2, pp. 132-143

Yeomans, M. and Millington, P. (1997) ‘Getting maintenance into TPM’, Manufacturing Engineer, Vol. 76, No. 4, pp.170–173

Downloads

Published

2018-04-02

How to Cite

Wee Jian Meng, J., & Mohd Yusof, N. (2018). SURVEY RESULTS OF TOTAL PRODUCTIVE MAINTENANCE EFFECTS ON MANUFACTURING PERFORMANCE IN MALAYSIA ELECTRICAL AND ELECTRONICS INDUSTRY. Jurnal Mekanikal, 35(2). Retrieved from https://jurnalmekanikal.utm.my/index.php/jurnalmekanikal/article/view/73

Issue

Section

Mechanical

Similar Articles

1 2 3 4 5 6 7 8 9 10 > >> 

You may also start an advanced similarity search for this article.